Mts Acumen Electrodynamic Test System Load Frame User Manual de usuario Pagina 27

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 74
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 26
Two-Column Load Frame
Two-Column Load Frame Description
DescriptionItem
Actuator and power electronics (behind hood).1
Columns on which the crosshead moves up and down.2
Actuator rod.3
Manual crosshead locks. Crosshead locks must be in a fully locked position to run a test.4
Frame-mounted control.5
T-slot base plate.6
Load cell mounted on table top (load cell can also be mounted on the actuator).7
Crosshead lift.8
Frame-mounted status light allows you to view system status at a glance. This status is
coordinated with the MP software System panel. Status is indicated by the following colors
and a blinking or solid light:
9
AC power to the frame is off.Unlit
Interlocked.Red (Solid)
MTS Acumen™ Electrodynamic Test System 27
Introduction
Vista de pagina 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 73 74

Comentarios a estos manuales

Sin comentarios