
ValueProperty
2 mmRelative End Level 1
-2 mmRelative End Level 2
N/APhase Lag
5.2.6.0 Adding a Second Ramp Activity
Use this task to add a second Ramp activity to the procedure. During the test, the second Ramp activity
ramps command to zero.
1. On the Procedure workspace, right-click the existing Ramp activity and select Copy. Then, right-click
below the Cycle activity and select Paste.
Copying and Pasting Existing Ramp Activity
2. Define Ramp activity properties:
a. Ensure that the Ramp activity is selected.
b. Enter the following as necessary:
Second Ramp Activity Properties
ValueProperty
Return to ZeroDisplay Name
46 Multipurpose Elite Test Design Guide
5.0 Creating Tests
Comentarios a estos manuales