Mts SWIFT 50 GLP Sensor Heavy Trucks Manual de usuario Pagina 51

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 112
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 50
Road and Track Vehicles
SWIFT 50 GLP Sensors Installation
51
C. Connect the cables from the Shunt A and Shunt B connectors on the
connector housing or the slip-ring bracket to the Shunt A and Shunt B
connectors on the TI box(es)
D. Secure the cables to the lateral strut of the road simulator so that it will
not become damaged during testing.
Be sure to leave enough slack for the full range of movement of the
simulation fixture.
10. Connect the power supply (12 V DC or optional 24 V DC) to the TI.
You might need to first convert from 120 or 240 V AC to 12 V DC or 24 V
DC.
11. Connect the data cables from the TI to the data recorder or your test control
system. There is one cable per channel of data from the TI to the data
recorder.
Vista de pagina 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 111 112

Comentarios a estos manuales

Sin comentarios