SWIFT 20 Sensors
84
Test Track Vehicle for Slip Ring Sensor
Installing the Transducer
5. Verify that the shunt contacts are covered.
Make sure that the plugs on the slip ring bracket (spider) cover are in place
so that no water will enter the contacts.
Make sure that the bayonette covers on the shunt connectors are securely
locked in place. Each cover should be twisted until it snaps into the retaining
groove.
6. Turn on the TI and let it warm up for 15-20 minutes before you zero the
strain gage bridges.
Comentarios a estos manuales